Additional CHP Experience
Exxon Mobil Research Facility Janssen Pharmaceutical
Clinton, NJ Raritan, NJ
Electrical installation for a 1.8 Megawatt 5KV Installation of a 1.75 Megawatt generator and associated
Co-Generation system and a 35KV utility tie in. switchgear. Tied in new generator to existing distribution
gear.
Kean College Janssen Pharmaceutical
Union, NJ Raritan, NJ
Electrical installation of a 1.8 Megawatt 5KV Co- Installation of 2 2 Megawatt generators including parallel
Generation system and 5KV utility tie in. Included replacing 5KV switchgear and tie in with existing distribution
all protective relaying, metering, and associated electrical equipment. Additionally installed 2 5000 amp double ended
equipment. substations, and electrical feeds to a total of 2 5KV chillers
and 5 cooling towers.
Ortho Clinical Diagnostics Mennan Arena
Raritan, NJ Morristown, NJ
Replacement of a 5 Megawatt 26KV primary, 5KV Installation of a 1.8 Megawatt combined rooftop and car
secondary transformer in the main electrical switchyard canopy solar generating facility including tie in to existing
and replacement of a double ended 5KV primary, 480V utility power.
secondary substation in an occupied building. Additionally
oversaw the installation of a 2 Megawatt generator replacing
3 existing generators and rerouting existing emergency
power feeds to accommodate the new generator including
new distribution switchgear accommodating load banking
and roll up generator capabilities.
Ortho Clinical Diagnostics Morris Count School Systems
Raritan, NJ Morris County, NJ
Installation of a 1.2 Megawatt ground mounted solar Replacement of a 5 Megawatt 26KV primary, 5KV
generation facility including installation of DC/AC inverters secondary transformer in the main electrical switchyard
and tie in to existing double ended 5KV primary, 480V and replacement of a double ended 5KV primary, 480V
secondary substation previously installed. secondary substation in an occupied building. Additionally
oversaw the installation of a 2 Megawatt generator replacing
3 existing generators and rerouting existing emergency
power feeds to accommodate the new generator including
new distribution switchgear accommodating load banking
and roll up generator capabilities.