Page 30 - Barr&Barr_Trinitas RFQ No. CHP-2010_Flipbook
P. 30

Combined Heating Cooling and Power Plant

                                           Montclair Central Energy Center - Little Falls, NJ




























           References:                                            EPC Contractor’s Role:
           DCO Energy                                             Installer only
           Dennis Fischer
           (609) 512-2245                                         Construction Dates:
                                                                  Design and construction activities were coordinated to maintain
           Project Description:                                   steam and electrical services to the campus buildings throughout
           Privately Funded. Th  e Combined Heating Cooling and Power   the construction period.
           (CHCP) plant includes a combustion turbine generator, a heat
           recovery steam generator (HRSG) with duct fi ring, an auxiliary   Current Operating Status:
           steam boiler, chillers, cooling towers and electrical generation   Operational
           equipment.
                                                                  Description of Claims:
           Th  e plant contains electric generation via a gas turbine generator,   None
           chilled water, cooling water, auxiliary cooling water, steam
           production equipment, primary pumping systems, high voltage
           electrical distribution, and fuel storage required to support the
           combustion gas turbine and the auxiliary boiler.

           Construction Cost:
           $5 Million


           Project Schedule:
           Project met delivery schedule.