Robert Wood Johnson University Hospital

                                                  Parking Deck and East Tower


































          SIZE                     OWNER
          252,000 square feet (650+ spaces)                      Robert Wood Johnson
          56,000 square feet (Offi  ce Space) University Hospital

          CONTRACT TYPE            ARCHITECT
          Construction Manager-at-Risk  NK Architects






                                                                   PROJECT DETAILS
         Th  e project includes a nine-story garage capable of holding 650+ cars       •   Located at the east end of the hospital’s campus
         and a new service vault with new substation and generators. On top   between Little Albany Street, Route 27, the
         of the garage will be two stories of offi  ce space and a data center. Th e   Amtrak Train tracks and the hospital’s existing
         structure and building systems are designed for additional vertical   garage.
         expansion in the future.
                                                                          •   Extensive coordination with Amtrak due to the
                                                                           location of adjacent and active railroad tracks.

                                                                          •   Logistics will include a limited staging area,
                                                                           alignment with existing garage, Amtrak
                                                                           required clearances and access to the existing
                                                                           hospital facilities.

                                                                          •   Investigation and materials survey to verify
                                                                           and expose hidden subsurface/soil conditions.

                                                                          •   Implementation of several early design
                                                                           release packages to ensure procurement of
                                                                           long-lead items to meet overall project schedule
                                                                           constraints.