          SIZE                     OWNER
          193,112 square feet (650 spaces)  UMass Lowell
                                   (UMBA project)
          CONTRACT TYPE
          Construction Manager-at-Risk  ARCHITECT
                                   Bertaux + Iwerks Architects






                                                                       PROJECT DETAILS
         Th  e North Campus Parking Garage includes a four-story precast       •   UMass Building Authority (UMBA) funded
         concrete parking structure built into the side of an existing parking lot   project.
         embankment to accommodate 644 additional spaces. Th e structure is
                                                                          •   Building Information Modeling (BIM)
         clad with combinations of terra-cotta and metal panel siding systems
                                                                           utilized for clash detection, 5D Quantity
         to provide both a screening of the vehicles and a “billboard palette” for
                                                                           Extraction, 3D Visualization and 3D Logistics.
         the university’s use.
                                                                          •   Astute planning for adjusted enabling
                                                                           infrastructure and coordinated site access
                                                                           with Mass DOT approvals to ensure timely
                                                                           construction sequencing.
                                                                          •   Challenging site conditions include the
                                                                           site’s proximity to the university gymnasium,
                                                                           embankment retention and rock removal
                                                                           conditions.
                                                                          •   Implementation of several early design
                                                                           release packages to ensure procurement of
                                                                           long-lead items to meet overall project schedule
                                                                           constraints.