The Lighthouse School for the Blind

                                                11 East 59th Street, New York, NY



































          CONSTRUCTION COST        COMPLETION DATE          OWNER
          $27 million              1995                     The Lighthouse School for the
                                                            Blind
          SCHEDULE                 CONTRACT TYPE
          29 months                Construction Manager-at-Risk  ARCHITECT
                                                            Mitchell/Giurgola Architects







                                                                       PROJECT DETAILS
         Complete demolition of an existing 6-story building and the demolition       •   New facility includes state-of-the-art
         of all  the interiors on a 14-story building; build a new 15-story steel   auditorium which seats 240 people located in
         structure erected where  the old 6-story building was demolished and   the basement; 1st fl oor houses shops, meeting
         new steel tied into the existing 14-story building with a new 15th fl oor   rooms, offi  ces and garage; 2nd fl oor, kitchen,
         and penthouse built on top.  Exposed facade on the existing 14-story   cafeteria, multi-purpose rooms; remaining fl oors
         building was removed and new brick work installed.  When completed   are for classrooms, offi  ces, conferences, library,
         a new building an entire city block long was created              special needs, training kitchens, clinics, labs,
                                                                           computer facility, administration and board
                                                                           room.
                                                                          •   Located in the heart of midtown Manhattan
                                                                           this block to block project required extensive
                                                                           permitting from the city due to its location.