Maimonides Medical Center
Facilities Modernization, Brooklyn, NY
CONSTRUCTION COST COMPLETION DATE OWNER
$73.2 million 2009 Maimonides Medical Center
SCHEDULE CONTRACT TYPE ARCHITECT
32 months Construction Manager-at-Risk PEAPC, LSGS, Guenther 5
Associates Architects
PROJECT DETAILS
Th e Maimonides Medical Center Major Modernization Project consists • Expansion of the Emergency Department
of the construction of a nine (9) story addition to the present Aaron
• Expansion of Neo-Natal ICU
Building. Th e new building also connects to the existing Gellman
Building. A new elevator and utility core serves all three (3) buildings. • Replacement of Medical/Surgical beds
• Increase in the number of Operating Rooms and
Renovation of the existing Aaron building was done with the new
replacement of existing Operating Rooms
construction.
• Replacement of Medical ICU beds
In addition, the new Ambulatory Surgery facility was built in the
Garage Basement across from the new addition on 48th Street. A two
(2) story bridge connects this facility to the new building as a direct
connection between in-patient and Ambulatory Surgery. New elevators
were constructed in the Garage to complement this connection.