Page 442 - 3K_e-Catalogue 2018
P. 442

4      ASSEMBLY AND INSTALLATION PROCEDURES



                                                        WARNING!

                        The  following  procedures  are  described  in  chronological  order  for  the  system  to  be
                                                     installed properly.

                        Anticipating or delaying one or more procedures could cause an obstacle to the subsequent
                                               assembly and installation stages.


            4.1    ASSEMBLING THE BEARING STRUCTURE (PLENUM)

                   The bearing structure (plenum) of the filter ceiling is provided in two distinct modules that must be assembled before they
            can be secured in the final position.






































            4.1.1   POSITIONING THE STRUCTURE ON ADJUSTABLE SUPPORT STANDS
                   Before assembling the two bearing structures, they must be positioned on the adjustable support stands in order to have
            easy access to the lower and inner part of the structure:
























                                                                   INSTALLATION AND MAINTENANCE      13
   437   438   439   440   441   442   443   444   445   446   447