Page 25 - Construction Guide
P. 25

7 DAY INSPECTION




           Your seven day inspection will be 7 days (give or take a day) after

           your start-up. You do not need to be present at this phase unless you

           would like to go over punch list items or missed the orientation.
           During this inspection a rep from Thunderbird Pools will do the

           following:


                               •  SET PUMP SCHEDULES

                               •  SET UV/OZONE TIMES IF APPLICABLE
                               •  CHECK CHEMICAL LEVELS, ADJUST IF NECESSARY
                               •  FOLLOW UP ON PUNCH LIST ITEMS
                               •  ORIENTATION IF NEEDED









                                30 DAY INSPECTION




          If you are not participating in our maintenance program, we will do
          one final inspection of the pool around 30 days after the start-up.

          During this time we will do a similar routine as the 7 day inspection

          with a couple changes.





                               •  CHECK CHEMICALS (INCLUDING CYA)

                               •  ADJUST WATER LEVEL
                               •  INSPECT PEBBLE FINISH

                               •  FOLLOW UP ON PUNCH LIST ITEMS


















                                                           -25-
   20   21   22   23   24   25   26