Page 72 - Area X - H
P. 72
(
EXTENSION PROGRAM
0 0 3 C o m m u n i t y e n g a g e m e n t i n c r e a s e d
4. Extension Program Performance Indicators Performance Indicators (PMT) Responsible Responsible Target 2018 Means of
DU SU Verification
O U T C O M E IND ICATO R S: VPRD ET, E T, Colleges E T P Form
4.1. Aggressive share of high-impact 1. N um ber o f active partnerships with CED 124
know ledge/ technologies LG Us, industries, N G O s, NG A s,
4.1.1. Preparation o f training needs SMEs, and other stakeholders as a result
assessment Instrum ents o f extension activities
(TNAI) and implement the O U T P U T IN D IC A TO R S VPRDET, ET, Colleges E T P Form
same 2. N um ber o f trainees weighted by the CED 6002.8
4.2. Preparation and implementation o f length o f training
high-impact extension # o f trainees | # o f days | weight
program s/projects/ activities 3. N um ber o f extension programs VPRD ET, ET, Colleges 5 ETP Form
organized and supported consistent CED
4.3 Establish active partnerships with the with the SUC’s m andated and priority
11 M LGUs o f Ifugao and other programs
G O s/N G O s/P O s 4. Percentage o f beneficiaries who rate the VPRDET, ET, Colleges 98% ETP Form
4.3.1 Identify, prepare and training course/s and advisory services CED
implement collaborative need- as satisfactory or higher in terms of
based extension proposals quality and relevance
4.3.2 4Im plem ent collaborative 5. No. o f TN A I crafted and implemented VPRD ET, ET, Colleges 1 per priority E T P Form
extension proposals and forge with analysis CED program
partnership (M O A /M O U , 6. N um ber o f persons trained (extension VPRDET, ET, Colleges (To be set by E T P Form
etc.) services) on: CED H D U and
a. G A D and GAD-related SWTs HSU)
4.4. Enhance com petence/expertise o f b. O ther SWTs
extension H R 7. No. of IEC packaged VPRDET, ET, Colleges 5 E T P Form
4.4.1. Identify and implement C ED
appropriate SWTs for
extension manpower
4.4.2. Specialized training/sem inar to
enhance expertise o f extension
H R
4.5. Increase num ber o f adopters
4.5.1. Showcase dem o projects with
high IRR
4.6. Technical Advisory Services
4.6.1. Provision o f technical services
8