Page 125 - Proceeding of Atrans Young Researcher's Forum 2019_Neat
P. 125

“Transportation for A Better Life:
                                                                                                                       Smart Mobility for Now and Then”

                                                                                    23 August 2019, Bangkok, Thailand

             another way, a corridor failing to gain the minimum   serious mistake. With a broader way to access and
             level  of  this  category  should  be  not  considered  a   analyze  the  Hanoi  BRT,  authors  in  [6],  [19]
             BRT  system.  OD  is  structure  into  one  category   emphasized that there were a series of barriers to the
             encompassing 12 potential issues to a BRT. Here,   BRT development in Hanoi from the conceptualized
             the  authors  use  criterion/criteria  to  refer  to  both   stage to operation phase. In fact, the system has not
             elements in DS and issues in OD. Each criterion is   received the political support, has encountered lack
             introduced in tandem with the maximum point and   of adequate legislative and staff preparation, not to
             responsive  requirements.  Lower  levels  of  meeting   mention  has  struggled  with  the  disagreement  of
             the criteria result in fewer point received.     citizens that keeps increasing day by day.
                    The  maximum  score  a  system  can  earn  is    On  the  one  hand,  the  earlier  studies  have
             100. Based on the full score, a system can obtain one   agreed with the fact that the Hanoi BRT is a failure
             among four rankings from the highest to the lowest   or unworthy. On the other hand, they seem to ignore
             as follows: Gold, Silver, Bronze and Basic BRT (see   an  important  question  that  is  the  Hanoi  BRT  is
             Table 1). If a system does not reach the minimum   whether eligible for a BRT corridor or not. And what
             point of Basic BRT, it is simply such a conventional   are possible and prioritized solutions to it? By means
             bus route yet being called BRT.                  of applying the BRTS for the Hanoi BRT, reasonable
                       Table 1 The BRTS rankings              responses to the mentioned-above questions would
                Rankings          Score and description       be found.
              Gold-standard
                  BRT                  85 or above            3. Applying the Bus Rapid Transit Standard
                 Silver-                                      for the Hanoi BRT
              standard BRT              70-84.9                Table 2 Operational parameters of the Hanoi BRT
                Bronze-
              standard BRT              55-69.9                           Parameter                Value
                            - Dedicated lanes: at least 3 km long   Official name              The Hanoi BRT
                            -  Dedicated right-of-way criterion:    Commercial kick-off time      01/2017
                            at least 4                         Corridor length (Km)                14.4
               Basic BRT                                       Segregated length (Km)               14
                            - Busway alignment criterion:
                            at least 4                         Interval at peak time (min)           5
                            - BRT basics category: at least 20   Interval at normal time (minutes)   10
                Non BRT     Fail to achieve Basic BRT          Interval at off-peak time (minutes)   15
                                                               Commercial speed (Km/hour)          21.5
             2.2 The Hanoi BRT                                 Opening time                        5h00
                    The Hanoi BRT is the outcome of a project   Closing time                       22h00
                                                                                                    17
                                                               Operational span (hours per day)
             lasting  10  years  under  the  consultation  and  the   Operational vehicle number
             financial support of the World Bank (WB). It was   (vehicles)                          22
             expected as a cornerstone of establishing the mass   Vehicle capacity (places)         90
             rapid transit in Hanoi. Especially, in case of long-  Terminal number (terminals)       2
             lasting  delays  of  urban  rail  lines,  the  local   Station number (stations)       21
             government and WB hoped its introduction would    Daily ridership (passengers per
             change fairly negative views of citizens on public   day)                             13500
             transport. Unfortunately, it has performed so worse   Station position               Median
             that  its  patronage  of  13500  passengers  per  day  is   (Vehicle) Door position    Left
             comparable to that of a conventional bus and that of   Level of boarding              High
             the Bangkok BRT which is considered a failure [16].   Fare validation               Off-board
             Possibly as a result of seeing its poor performance,   Source: Reports of the BRT company and [6]
             many  authors  have  provided  studies  focusing  on    In this section, categories and their criteria
             limitations  of  the  Hanoi  BRT.  As  the  pioneer,   are analyzed for the Hanoi BRT before scores are
             Fjellstrom   (2017)   criticized   missteps   of   given. As indicated above, there are seven categories
             infrastructure  design  [17],  [18].  Both  stations  and   with six of DS and one of OD. The final score is the
             vehicles have low capacity and thus not appropriate   base for ranking the corridor.
             for  high  volume  of  passengers.  In  addition,  the   3.1. BRT basics (5 criteria)
             selection of the corridor direction in parallel with a   This category includes five critical elements
             rail  line  that  is  in  pilot  operation  now  is  another   that enable to eliminate delays and thus create the



                                                           100
   120   121   122   123   124   125   126   127   128   129   130