Foundations and the Terrain



                                                                       the lower end of the slope so that a door can
                                                                       be positioned above the terrain at that end.
                                 Floor platform
                                                                       To create a walkout basement, build a stem
                                                                       wall foundation and modify these settings in
                                                                       the Terrain Specification dialog:
                                                                       •  Uncheck Flatten Pad.
                                                                       •  Uncheck Auto Calculate Elevation.

                                 Stem Wall Top                         You will also need to create sloped terrain
                                                                       and adjust the Building Pad Elevation and/
                                                     Terrain           or terrain data so that the terrain is at the
                                                                       appropriate height relative to the structure at
                                                                       both the high and low ends of the slope.
                               By default, the program will also create a
                               flattened pad under the building footprint.
                                                                             Stepped Foundations
                               Not all foundations have these requirements,
                               of course, so you can customize your    Stepped foundations are usually built on
                               foundation and terrain to suit your needs.  sloping terrain. A stepped foundation will be
                                                                       produced automatically if more than one
                                      Daylight Basements               floor height is present on Floor 1 when the
                                                                       foundation is built.
                               Daylight basements, also referred to as look-
                               out basements, have walls that are tall   In floor plan view, steps in stem wall and
                               enough for basement windows to be       monolithic slab foundations are represented
                               positioned above the terrain. They are often   using S markers. See “Displaying
                               found in split level or split entry structures.  Foundations” on page 693.
                                                                       As with a walkout basement, you will need
                               To create a daylight basement condition,
                               build a stem wall foundation and modify   to build a stem wall foundation and modify
                               these settings in the Terrain Specification   these settings in the Terrain Specification
                               dialog:                                 dialog:
                                                                       •  Uncheck Flatten Pad.
                               •  Uncheck Auto Calculate Elevation.
                                                                       •  Uncheck Auto Calculate Elevation.
                               •  Increase the Building Pad Elevation,
                                  which is the distance between the default   You will also need to create sloped terrain
                                  floor height of Floor 1 and the terrain.   and adjust the Building Pad Elevation and/
                                                                       or terrain data so that the terrain is at the
                                      Walkout Basements                appropriate height relative to the structure at
                                                                       both the high and low ends of the slope.
                               Walkout basements are a type of daylight
                               basement typically located on sloped terrain.   You can also create a stepped foundation by
                               They feature walls that are above ground at   editing foundation rooms and walls. See
                                                                       “Stem Wall Height” on page 696.