Page 24 - Rosendin Corporate Newsletter_Q1 2020
P. 24
10 years from now and to enable innovation and and mapped against our manufacturers,
improvement at Rosendin. Innovation and change is distributors, and rep firms by Purchasing (a
a reaction to one of three typical situations: ROSENDIN INNOVATION. NOT IF, BUT WHEN massive and complex undertaking). This is
▶ React to something that went wrong and needs the follow-on work from the iProcurement
fixing or occurs outside of our control, such as rollout.
CAPITALIZING ON OUR SIZE –
COVID-19. What’s making all of this work together are
▶ Optimize what we’re doing to make life easier/ the InterOp and the new Job Cost Reports
safer or make a little more money. teams. Think of this as working to a common
GODZILLA IS OUR SPIRIT ANIMAL, goal by two cooperating groups coming at
▶ A profound change where we can be a leader or it from opposite ends of a global process.
ACCORDING TO ONE CUSTOMER Paolo, the Oracle Team, Matt Lamb, and
to get well ahead of a trend or the pack.
Motivation often comes from outside forces Finance are on the Job Cost/Project Controls
– COVID-19, a poor safety record, a business or backside while Estimating, Engineering,
project losing money, business processes that are invention. We may not know how we’re going to getting there, but we absolutely BIM, R&D, and Purchasing working on the
inefficient or good people leaving for a better place. know where we want to end up. front end. This new process results in a
Those are reactions. Reaction is not invention – it’s very sharp Construction Estimate with
An excellent example of this is the arc flash, and the subsequent solar module
an emotional flee-or-fight response. When you’re information taken directly from the Design
install robot. While the arc flash robot idea didn’t pan out as we had envisioned,
under duress, it’s too late to realize the full benefit and Construction models. We’re now able
it did show that a tracked solution and a common movement platform was
of your actions versus seeing it early and acting to Estimate directly from what’s actually in
the correct approach for larger robotics. Think of it as a 5-ton drill motor - you
sooner. those models. Was the first effort perfect?
simply change the bits. We often find great solutions in the rubble of failure.
We have all faced that unenviable situation of Rosendin has a lot of things over most - bench depth, money, a solid expertise No, but that’s part of the invention journey,
sitting your office, trailer, or kitchen table early in base in all areas of the company, selfless execution, and, most importantly, a and it’ll be continually improved after
the morning or late at night trying to catch up on strong motivation to improve, lead and win. This runs from Tom, Larry and the the rollout. Couple this with Kit-of-Part
crucial work. Who hasn’t been dragged into a low- Board, to Mike, Paolo and the EC, to the VPs and DMs, to the folks on the line. Look standardization, and you get a better, less
quality meeting, been forced to follow a process at what Safety, Training, and Quality have done for us. They are leaders in what cost-to-produce Construction Estimate.
that doesn’t map to ours, or have been forced to they do. It’s in our bones to improve and excel together. Once the Construction Estimate is
work in a business process that has no real value to completed, it is run through an Accubid-
you or the business? It’s not LEAN and never fun. Unsurprisingly, I have a funny story about Rosendin’s dedication when we Oracle translator called the Budget
choose a direction. A competitor at a conference happy hour rolled up to
We’re going to do something about it. Where we can Workbook, aka "The Budgetnator." The
Justin Tinoco and me. He told us that his outfit could move faster and ARE
and to our fullest capacity, we will refuse to live in Budgetnator is the brainchild of Vu Le and
better than us. A funny thing happened. One of our owners who was with us,
this uninspiring and mediocre space. This negatively Charles Zhou. It translates the Estimate in
laughed at the guy and told him that Rosendin was Godzilla. Our client went
impacts you and our customers and has direct Accubid to a format that can be directly
on to compare Rosendin to the fictional monster, saying that when Rosendin
effects on our execution and job satisfaction. translated into Oracle, based on how the
is moving and focused there is nothing you can do to stand in their way. And job will be built. It’s a brilliant bit of work
"ANYONE CAN BE he’s right. Rosendin possesses substantial financial and expertise resources that’s in rollout right now. No more massive
MEDIOCRE. LET’S NOT BE coupled with a yearning desire to get better every day. That moves the needle. data entry by the PM at the project’s launch.
These inventions streamline existing
Godzilla still roams the countryside. I sense a t-shirt logo in there somewhere.
ANYBODY." processes, with a strong focus on upfront
WHAT ARE WE INVENTING TODAY
planning and eliminating double work. It’s
People often say that small companies and groups Right now, we have several irons in the fire. The Modular Electrical Power Panel in not a new process, just far improved on,
can move faster and innovate better than a physical prototype development. Everything is either the first of its kind or has with less translational error with perfect
larger organization. They contend that large never been tried. All of these products and systems will be covered by either reconciliation between the estimate and
firms have entrenched habits and prejudice for provisional patents or confidential know-how. We have several ideas at the JCR.
inaction, especially if they are making money.
Nonsense. Nothing is more dangerous than a patent lawyers, so we can’t show them to you just yet. In the next edition, we’ll Last and certainly not least is the installation
large, motivated, strongly-resourced, smart, have something to show you all. automation we’re looking at for in our
goal-dedicated outfit. Our first mission is the Kit-of-Parts. The project seeks to standardize what Renewables business. This addresses
Innovation will not always succeed. We’ll admit our we estimate/sell, then define our work either in the model or in the BOMs, buy several areas – robotic panel installation,
failures as loudly as we trumpet our successes. it, and finally deliver it efficiently. When you install hundreds of thousands, autonomous excavation, compaction and
Some of our goals are “reach” goals, nothing is if not millions of the same assembly or activity every year, small gains lead backfill, robotic pier placement and driving,
undertaken without some certainty of the outcome. to tremendous results. By the end of 2020, we will have cataloged and robotic site staking/feathering, UAV quantity
The business case and its expected results are standardized assemblies for supports (OSHPD, critical facility, and non-seismic), and geo surveying, and changes to panel
vetted before we commit time or money to any in-wall and in-ceiling rough-in, and commodity/back-of-house lighting fixtures. attachment and electrification means and
All of these new standards are being reviewed and approved by the Field methods.
24 The Feeder | Issue 1, 2020 Issue 1, 2020 | The Feeder 25