Page 25 - Rosendin Corporate Newsletter_Q1 2020
P. 25

10 years from now and to enable innovation and                                and mapped against our manufacturers,
 improvement at Rosendin. Innovation and change is                             distributors, and rep firms by Purchasing (a
 a reaction to one of three typical situations:  ROSENDIN INNOVATION. NOT IF, BUT WHEN  massive and complex undertaking). This is
   ▶ React to something that went wrong and needs                              the follow-on work from the iProcurement
 fixing or occurs outside of our control, such as                              rollout.
        CAPITALIZING ON OUR SIZE –
 COVID-19.                                                                     What’s making all of this work together are
   ▶ Optimize what we’re doing to make life easier/                            the InterOp and the new Job Cost Reports
 safer or make a little more money.                                            teams.  Think of this as working to a common
        GODZILLA IS OUR SPIRIT ANIMAL,  goal by two cooperating groups coming at
   ▶ A profound change where we can be a leader or                             it from opposite ends of a global process.
        ACCORDING TO ONE CUSTOMER                                              Paolo, the Oracle Team, Matt Lamb, and
 to get well ahead of a trend or the pack.
 Motivation often comes from outside forces                                    Finance are on the Job Cost/Project Controls
 – COVID-19, a poor safety record, a business or                               backside while Estimating, Engineering,
 project losing money, business processes that are   invention. We may not know how we’re going to getting there, but we absolutely   BIM, R&D, and Purchasing working on the
 inefficient or good people leaving for a better place.   know where we want to end up.  front end. This new process results in a
 Those are reactions. Reaction is not invention – it’s                         very sharp Construction Estimate with
        An excellent example of this is the arc flash, and the subsequent solar module
 an emotional flee-or-fight response. When you’re                              information taken directly from the Design
        install robot. While the arc flash robot idea didn’t pan out as we had envisioned,
 under duress, it’s too late to realize the full benefit                       and Construction models. We’re now able
        it did show that a tracked solution and a common movement platform was
 of your actions versus seeing it early and acting                             to Estimate directly from what’s actually in
        the correct approach for larger robotics. Think of it as a 5-ton drill motor - you
 sooner.                                                                       those models.  Was the first effort perfect?
        simply change the bits. We often find great solutions in the rubble of failure.
 We have all faced that unenviable situation of   Rosendin has a lot of things over most - bench depth, money, a solid expertise   No, but that’s part of the invention journey,
 sitting your office, trailer, or kitchen table early in   base in all areas of the company, selfless execution, and, most importantly, a   and it’ll be continually improved after
 the morning or late at night trying to catch up on   strong motivation to improve, lead and win. This runs from Tom, Larry and the   the rollout. Couple this with Kit-of-Part
 crucial work. Who hasn’t been dragged into a low-  Board, to Mike, Paolo and the EC, to the VPs and DMs, to the folks on the line. Look   standardization, and you get a better, less
 quality meeting, been forced to follow a process   at what Safety, Training, and Quality have done for us. They are leaders in what   cost-to-produce Construction Estimate.
 that doesn’t map to ours, or have been forced to   they do.  It’s in our bones to improve and excel together.  Once the Construction Estimate is
 work in a business process that has no real value to                          completed, it is run through an Accubid-
 you or the business? It’s not LEAN and never fun.  Unsurprisingly, I have a funny story about Rosendin’s dedication when we   Oracle translator called the Budget
        choose a direction.  A competitor at a conference happy hour rolled up to
 We’re going to do something about it. Where we can                            Workbook, aka "The Budgetnator." The
        Justin Tinoco and me. He told us that his outfit could move faster and ARE
 and to our fullest capacity, we will refuse to live in                        Budgetnator is the brainchild of Vu Le and
        better than us. A funny thing happened. One of our owners who was with us,
 this uninspiring and mediocre space. This negatively                          Charles Zhou. It translates the Estimate in
        laughed at the guy and told him that Rosendin was Godzilla. Our client went
 impacts you and our customers and has direct                                  Accubid to a format that can be directly
        on to compare Rosendin to the fictional monster, saying that when Rosendin
 effects on our execution and job satisfaction.                                translated into Oracle, based on how the
        is moving and focused there is nothing you can do to stand in their way. And   job will be built.  It’s a brilliant bit of work
 "ANYONE CAN BE   he’s right. Rosendin possesses substantial financial and expertise resources   that’s in rollout right now. No more massive
 MEDIOCRE. LET’S NOT BE   coupled with a yearning desire to get better every day. That moves the needle.    data entry by the PM at the project’s launch.
                                                                               These inventions streamline existing
        Godzilla still roams the countryside. I sense a t-shirt logo in there somewhere.
 ANYBODY."                                                                     processes, with a strong focus on upfront
        WHAT ARE WE INVENTING TODAY
                                                                               planning and eliminating double work. It’s
 People often say that small companies and groups   Right now, we have several irons in the fire. The Modular Electrical Power Panel in   not a new process, just far improved on,
 can move faster and innovate better than a   physical prototype development. Everything is either the first of its kind or has   with less translational error with perfect
 larger organization. They contend that large   never been tried. All of these products and systems will be covered by either   reconciliation between the estimate and
 firms have entrenched habits and prejudice for   provisional patents or confidential know-how. We have several ideas at the   JCR.
 inaction, especially if they are making money.
 Nonsense. Nothing is more dangerous than a   patent lawyers, so we can’t show them to you just yet. In the next edition, we’ll   Last and certainly not least is the installation
 large, motivated, strongly-resourced, smart,   have something to show you all.   automation we’re looking at for in our
 goal-dedicated outfit.  Our first mission is the Kit-of-Parts. The project seeks to standardize what   Renewables business.  This addresses

 Innovation will not always succeed. We’ll admit our   we estimate/sell, then define our work either in the model or in the BOMs, buy   several areas – robotic panel installation,
 failures as loudly as we trumpet our successes.   it, and finally deliver it efficiently. When you install hundreds of thousands,   autonomous excavation, compaction and
 Some of our goals are “reach” goals, nothing is   if not millions of the same assembly or activity every year, small gains lead   backfill, robotic pier placement and driving,
 undertaken without some certainty of the outcome.   to tremendous results. By the end of 2020, we will have cataloged and   robotic site staking/feathering, UAV quantity
 The business case and its expected results are   standardized assemblies for supports (OSHPD, critical facility, and non-seismic),   and geo surveying, and changes to panel
 vetted before we commit time or money to any   in-wall and in-ceiling rough-in, and commodity/back-of-house lighting fixtures.   attachment and electrification means and
        All of these new standards are being reviewed and approved by the Field   methods.


 24    The Feeder | Issue 1, 2020                                                       Issue 1, 2020 | The Feeder    25
   20   21   22   23   24   25   26   27   28   29   30