Page 11 - COMPANY PROFILE
P. 11
Laying, jointing, testing and disinfecting of UPVC pressure pipe line dia ranges
75mm to 150mm (Rising Main ) 15 KM Cost Of the Project RS. 20,000,000/=
rawalpindi
FROM JUNE 1993 : TO FEBRAURY 1995
EMPLOYER : M/s. Al-Saigh Establishment (K.S.A)
POSITION HELD : Project Manager
Al Badaya Al Rass Water Supply Scheme Al Qasim & Al Buryada Water Supply
Scheme Al Qasim (KSA).
DESCRIPTION OF DUTIES
Ductile Iron Pipe Line Water Distribution System which includes the following
nature of work
Preparation of shop drawing.
Survey and leveling
Laying, Jointing, testing and disinfecting of Ductile Iron Pipe line work of two
main projects dia ranges from 300mm to 600mm
Estimation and calculation of all ductile iron fittings as per consultant drawings
Preparation of running mills of the said two projects
Designing and execution of all concrete chambers like air valve chambers
butterfly valve chamber and wash out chambers as per client requirement
Preparation of As-built drawing.
Construction of internal roads
Preparation of cost estimate and tender document for other projects in (K.S.A)
FRO APRIL 1989 : TO MAY 1993
EMPLOYER : M/s. DadexEternit Ltd. Karachi
POSITION HELD : Project Engineer
DESCRIPTION OF DUTIES :
Design & Consultation of Industrial Projects which included
Survey and designing of pressure pipe Lines for water supply schemes
Laying Jointing Testing and disinfecting of AC Pressure pipes dia ranges from
80mm to 600mm
Designing and Execution of machine Pipe plant at Karachi and Hyderabad for
Dadex of Projects
Designing and Execution of sub Surface Drainage system of Karachi factory
Designing and drawings UPVC Pipe Plant (Extension) including BOQ,
Specification, Preparation of lectures for seminars to Educate the Engineers and
Architects about the Design Laying and jointing and testing of water supply and
sewerage system with the help of slides and transparencies
10