  Finalization of detail drawings, Architectural drawing, electrical/mechanical and
                              tender documents and detail specifications.
                            Preparation and implementation of construction Schedule.
                            Surveying ,land marking, demarcation, excavation, dewatering,
                            Preparation of tender document for Dadex head office Building
                            Preparation of specification and selection of A class contractor for different
                              works (civil, Electrical plumbing and Mechanical)
                            Laboratory testing of civil construction material such as fine aggregate, coarse
                              aggregate, cement, steel Reinforcement and water
                            Testing of concrete cubes concrete slumps, sieve Analysis
                            Preparation of daily, weekly and monthly progress report including checking of
                              all petty contractors running bills.
                            Co-ordination between consultant and client including Govt. Agencies as KDA,
                              KMC, CAA, etc.
                            Checking of Contractor and Consultant Monthly bills.
                            Checking and finalization of as built Drawing and Handing and Taken over
                              documents.
                            Also to look after the all construction activity and monitoring the construction
                              schedule.
                            Construction supervision of the Civil finishing works  Electrical items,Plumbings
                              items

                        FROM MARCH 1995                    :      TO APRIL 1996

                       EMPLOYER :  M/s. DadexEternit LTD Karachi

                                            Joint Venture of Belgium and Holland
                       POSITION HELD               :       Manager Projects (Civil)

                        DESCRIPTION OF DUTIES:

                        Analysis and Preparation cost estimate and Execution of the following projects.

                            Preparation of as Built Drawings
                            Water Supply Scheme, DajalTahseel Jam Pur  District Rajan Pure
                            Laying, jointing, testing and disinfecting of F.C pressure pipe line dia 300mm
                              (Rising Main) 22KM Cost of the Project RS. 243, 00,000/=.
                            Water Supply Scheme, ChotiZareen D.G Khan
                            Laying, jointing, testing and disinfecting of F.C pressure pipe line dia ranges
                              75mm to 400mm (Rising Main) 10 KM Cost Of the Project RS. 14,500,000/=
                            Leak Proof Treatment For Residential Accommodation of Mangla Cantonment,
                              District Jhelum
                            Using DadexNalidar beam roofing system having a length of 12ft, 16ft, 20ft and
                              14ft cost  of the  project  Rs.70, 00,000/=