Page 8 - COMPANY PROFILE
P. 8

  Surveying ,Planning ,designing  and preparation of Tender documents including
                              BOQ Construction drawings and detail supervision of water supply  line (500 mm
                              UPVC  pipe 6.500 KM) from Siphon- 9 of KW&S to PQA water works.
                            Sewerage system Three Town of Karachi (Lyari, Kemari and sadder town)
                            Surveying, Planning, designing, preparation of tender documents, Construction
                              drawings and BOQ including detail supervision for 48’’ dia MS (12.220 KM) and
                              36’’dia PRCC (6.000 KM) total length of pipe line was (18.220 Km) water line
                              from HUB reservoir to Baldia Town Karachi.
                            Surveying, planning, designing, preparation of tender documents, Construction
                              drawings and BOQ including detail supervision for 750 mm dia GRP (6.500 KM)
                              water main right from malir Bund to DHA reservoir phase VIII Karachi.
                            Surveying, Planning, designing, preparation of tender documents, Construction
                              drawings and BOQ for 600 mm’ dia D I (42.00 KM) water  line from ShadiKhure
                              Dam to Pasni city Baluchistan Pakistan for the improvement of water supply
                              system of main city of Pasni
                            Responsible for checking and verification of contractor Interim payments
                              certificate/ producing changes in construction drawings as per site conditions
                              /attending site meetings/progress reports/ Tender Evaluation reports and site
                              presentations/checking and approval of materials/project related
                              correspondence/final checking and punch list i/c issuing of substantial
                              completion and taking/Handing over certificates.
                            I am also the approved Structural of H.D.A (Hyderabad Development Authority)
                              and KDA (Hyderabad Development Authority).

               POSITION HELD         :      Manager Projects (Civil)


               DESCRIPTION OF DUTIES               :

                1)  Muslim Town Yusuf Colony Water Distribution System Extension Rawalpindi Cost
                    of the project RS 4, 55, 55,850/= through Asian Development Bank.
               Duties performed as follows:
                            Laying, Jointing, Testing and Disinfecting of AC pressure pipe Dia ranges 80mm to
                              600  mm
                            Laying, Jointing, Testing and Disinfecting of G.I/steel pressure pipe Dia ranges
                              80mm to 600mm.
                            Laying, Jointing, Testing and Disinfecting of C.I Fittings for A.C pressure pipe Dia
                              ranges            80mm to 600mm.
                            Designed, and Construction of Gate valve chambers  Fire Hydrant Chambers and
                              Flow meter chambers
                            Preparation of Monthly Running Bills
                            Preparation of As Built Drawings and final Bill
                            Execution and Monitoring the project


                                                                                                            7
   3   4   5   6   7   8   9   10   11   12   13