Page 9 - COMPANY PROFILE
P. 9
2) Tertiary Water Distribution System of Sadiqabad Rawalpindi Cost of the project RS
3, 3,000,000/= under Asian Development Bank.
Duties performed as follows.
Laying, Jointing, Testing and Disinfecting of UPVC pipe Class B dia ranges from
80mm to 150mm
Laying, Jointing, Testing and Disinfecting of polyethylene pipe dia 20mm,
25mm&32mm.
Preparation of Monthly Running Bills
Preparation of as Built Drawings and final Bills
Execution, Supervision and monitoring the project activities.
3) Rehabilitation of Water Works I&II (Civil Works) in Rawalpindi Cost
RS 2, 40, 00,000/=Under Asian Development Bank
Duties performed as follows
Execution and Construction of Chlorinating Building
Construction of Transformer Room
Execution and Construction of Security Check Post
Execution and Rehabilitation of Pump Chamber and Ground Storage tank
Rehabilitation of overhead reservoir Capacity 2, 50,000 Gallon.
Laying, Jointing, Testing and Disinfecting of AC pressure pipe Dia ranges 200mm
to 250mm. Class D
Supply and Installation of Steel pipes and accessories Dia Ranges 300mm to
900m
Leak proof Treatment of Over head Reservoir capacity 2.5million Gallon
Internal Concrete reinstatement and asphalt reinstatement.
Preparation of monthly running bills to RDA
Preparation of as Built Drawings
FROM JUNE 1996 : TO APRIL1999
EMPLOYER : M/s. DadexEternit LTD Karachi
Joint Venture of Belgium and Holland
POSITION HELD : Manager Projects
NAME OF PROJECTS : Construction of Dadex Head Office Building (G+11)
Shara-e-Feisal Karachi.
DESCRIPTION OF DUTIES
Preparation of cost estimate for Dadex Head Office Building
Selection and finalization of Structural consultant Architectural consultant i/c
plumbing, electrical and air conditioning.
Preparation agreements b/w owner and the land lords.
8