  Preparation  of  PC-1  Treated  Effluent  pipe  line  (PE  250mm  dia)  from  sewage
                              treatment plant to Rohri Canal.
                            Planning ,designing , and preparation of BOQ  of Treated Effluent pipe line (PE
                              250mm dia) from sewage treatment plant to Rohri Canal.


                4-Construction of Tube Well & Pump House. KHAIRPUR SPECIAL
                ECONOMIC ZONE.

                            Construction of Tube well and pump house.
                            Designing and selection of Pumps for tube well
                            Preparation of PC-1 for Tube Well & Pump House.
                            Planning  designing,  and  preparation  of  BOQ  of  Construction  of  Tube  Well  &
                              Pump House. KHAIRPUR SPECIAL   ECONOMIC ZONE


                5-   Detailed Design & Construction Supervision of Additional 65 MGD
                       Water Supply Scheme from Haleji to Pipri, Karachi. (KW&SB)


                            Preparation of PC-1 for the said Project. Costing about Rs 6,000 Millions.
                            Preparation of tender documents (legal parts ) Specification ,bill of quantizes
                            Preparation of tender/Construction drawings.
                            Preparation of Engineer estimate on the bases of CSR and also with RA.
                            Preparation of Re casted PC-1
                            Preparation Inception Report
                            Preparation of EIA (Environmental Impact assessment) report
                            Selection of Piper material .for pumping main and gravity main
                            Preparation of Presentation on power point
                            Attending the meeting with client /Contractors
                            Preparation of Prequalification documents and evaluation reports.
                            Preparation of documents on EPC(Engineering ,procurement and Construction )

               Saudi Armco (Riyadh) Saudi Arabia through M/S Albusaily                              and
               Company (electrical and mechanical works)

               POSITION HELD       :   PROJECT MANAGER

               DESCRIPTION OF DUTIES

                            As per Aramco standards procedure, I am as project manager responsible to look
                              after the all related works carried out under Aramco
                            Dealing all labor, supervisor, civil, Electrical and Mechanical Engineers
                            Responsible  all  civil,  Electrical  and  Mechanical  works  under  PO  (project  order
                              mmt (Minot maintenance ticket) in Rabwah compound Riyadh refinery and KKIA
                              (King Khalid international airport) area