Page 131 - Facilities Master Plan 2016
P. 131
PROGRAM ACTIVITIES & SPATIAL FEATURES
ACTIVITIES
Assemblies and large group presentations, community use, food
service seating / social gathering, campus hub, student and teacher
gathering, overflow instructional activities for P.E./Fitness, or Music
Vernonia K-12 School
SPATIAL FEATURES
Furniture
Kiosk locations spread throughout campus to reduce overcrowding at
serving lines and create more access to food options for students and
teachers.
Recycling area for storage and collection of recyclables.
Storage for instruments, props/costumes, and accessible sinks.
Display area for non-sports related club and activities.
Finishes
PRECEDENT IMAGERY Acoustically planned space. Ceilings should be acoustically absorptive and
durable / appropriate for dining areas. Acoustical wall panels may be
San Marcos High School
necessary to control sound during large events.
“Food is our common ground, a Flooring should be resilient, durable, and easy to clean.
universal experience.” Adjustable lighting for testing, presentation, assembly, or community event.
Equipment
Audio-Visual systems for presentation capabilities.
- James Beard Food service area to conform to health department standards and
equipment to be verified by the district.
3.3 EDUCATIONAL VISION DOCUMENT Facilities Master Plan 90
CAMPUS ACTIVITY CENTER Lodi Unified School District