Lodi Unified School District                                            Lodi Unified School District
          Ansel Adams Elementary School                                           Beckman Elementary School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                     19-Apr-16  Opinion of Probable Cost                                    19-Apr-16
                         Project Cost Summary (2016$) - Ansel Adams Elementary School            Project Cost Summary (2016$) - Beckman Elementary School
                                                       Construction Costs   Total Project                                      Construction Costs   Total Project
          Item                       Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item    Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
           16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -  01 Modernize & Reconfigure Aging Classrooms  $                       -  $                             -
            16a Flexible furniture (Per Classroom, Direct Cost)                     27 ea  $       15,000.00  1b Replacement or repair of walls
                                                                                    1b.2 Repair walls                  23,940 sf  $               12.60
                                                                                   1c Replacement or repair of windows
           17 Technology Infrastructure                    $                       -  $                             -  1c.2 Repair windows             23,940 sf  $                 3.60
            Not included in this Facilities Needs Assessment                       1d Replacement or repair of doors (other than safety locks
                                                                                   @ classroom doors)
                                                                                    1d.2 Repair doors & hardware             23,940 sf  $                 4.50
          Total Construction/Project Cost (2016$)          $              411,000  $547,000  1e Replacement or repair of floors
                                                                                    1e.2 Repair floors                 23,940 sf  $               10.80
                                                                                   1f Replacement or repair of ceilings
          The following items are excluded from this budget:                        1f.2 Repair ceilings               23,940 sf  $                 8.10
           Utility hook-up fees & City connection fees.                            1g Patch & Paint Interior/Exterior
           Offsite work and traffic signals.                                        1g.1 Patch & paint interior             23,940 sf  $                 3.10
           Land acquisition costs.                                                  1g.2 Patch & paint exterior             23,940 sf  $                 4.50
           Hazardous material surveys, abatement, and disposal.                    1o Replace Existing Roofing             40,901 sf  $               20.93
           Escalation (Costs are in 2016$ calculated to the end of the year).      1p Repair Existing Covered Walkways / Hallways                6,237 sf  $               13.00
                                                                                  02 Existing Building Systems & Toilets          $                       -  $                             -
                                                                                   2a HVAC system upgrades             23,940 sf  $               29.00
                                                                                   2b Lighting upgrades - new interior lighting & controls             23,940 sf  $               15.00
                                                                                   2c Electrical upgrades
                                                                                    2c.1 Upgrade electrical wiring & increase electrical
                                                                                    outlets                            23,940 sf  $                 9.00
                                                                                   2d Plumbing system upgrades             23,940 sf  $               11.00
                                                                                   2e Replace aging plumbing, upgrade and/or expand
                                                                                   restroom facilities
                                                                                    2e.1 Modernize Existing Restroom                1,236 sf  $               83.00
                                                                                   2f Energy-efficient building systems and controls (EMS
                                                                                   system, per sf of Bldg)             23,940 sf  $                 7.20
                                                                                  03 Site Utilities                               $                       -  $                             -
                                                                                   (For entire campus and site)
                                                                                   3a Updated gas service lines           435,600 sf  $                 0.14
                                                                                   3b Updated sewer service lines           435,600 sf  $                 0.25
                                                                                   3c Updated water service lines           435,600 sf  $                 0.32
                                                                                   3d Updated electrical mains and distribution           435,600 sf  $                 0.72
                                                                                   3f Electrical Capacity Upgrades                        1 ls  $     115,000.00
                                                                                  04 Classrooms New Construction                  $                       -  $                             -
                                                                                   4a New Construction - Pre-School, DK & Kindergarten
                                                                                    4a.2 New Pre-School, DK & Kindergarten Building                4,455 sf  $             395.00
                                                                                    4a.4 Sitework & Site Improvements                4,455 sf  $               38.00





         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  574
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District
   598   599   600   601   602   603   604   605   606   607   608