Page 650 - Facilities Master Plan 2016
P. 650

Lodi Unified School District                                            Lodi Unified School District
          Victor Elementary School                                                Victor Elementary School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                          Project Cost Summary (2016$) - Victor Elementary School                 Project Cost Summary (2016$) - Victor Elementary School
                                                       Construction Costs   Total Project                                      Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
          12 Safety, Security & Campus Control             $              843,000 $                 1,121,000  Total Construction/Project Cost (2016$)  $           1,749,000  $2,326,000
            12b Safety improvements to and/or new parent/bus drop-off areas and parking
            12b.1 New Parking Lot              10,000 sf  $               16.00 $            160,000
            12b.5 New Drop-off Area                7,000 sf  $               18.00 $            126,000  The following items are excluded from this budget:
            12b.9 Repair existing Parking Lot             12,000 sf  $                 6.30 $              76,000  Utility hook-up fees & City connection fees.
            12b.11 New concrete walkways                2,600 sf  $               15.00 $              39,000  Offsite work and traffic signals.
            12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $              40,000  Land acquisition costs.
            12e Safety locks at classroom doors                     15 ea  $             449.00 $                 7,000  Hazardous material surveys, abatement, and disposal.
            12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $              32,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12g Marquee Sign                              1 ea  $       10,000.00 $              10,000
            12h Fencing with controlled campus entrances
            12h.2 Decorative Metal Fencing & Gates                   290 lf  $             252.00 $              73,000
            12h.3 Rolling Decorative Metal Gate                        1 ea  $       27,000.00 $              27,000
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             15,635 sf  $                 5.40 $              84,000
            12i.2 Emergency Lighting             15,635 sf  $                 1.40 $              22,000
            12j New public address/emergency communication
            systems                            15,635 sf  $                 7.60 $            119,000
            12k Intrusion alarms               15,635 sf  $                 1.80 $              28,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $                       -  $                             -
            14b Learning Courts
            14b.2 New Learning Court                3,000 sf  $               21.85
           15 Exterior Play Spaces, Playfields & Hardcourts  $                       -  $                             -
            15a Kindergarten Play Yard
            15a.1 New Rubberized Surface Play Area                1,200 sf  $               20.00
            15b PE Play Yard & Hardcourts
            15a.1 New Rubberized Surface Play Area                1,500 sf  $               20.00
            15b.5 Resurface & Repair Hardcourts             29,700 sf  $                 5.00
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       12,666.67
            15c Playfields
            15c.1 Repair Playfields           129,000 sf  $                 3.00
           16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -
            16a Flexible furniture (Per Classroom, Direct Cost)                        8 ea  $       15,000.00

           17 Technology Infrastructure                    $                       -  $                             -
            Not included in this Facilities Needs Assessment






         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  621
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District
   645   646   647   648   649   650   651   652   653   654   655