Page 21 - FreesStyler® Installation and Startup
P. 21
®
INSTALLATION AND STARTUP
Chapter 2 Recommended Installation Sequence Checklist
Main
Become Familiar with Site
Building dimensions: Location of: Determine proper location: Required Material:
• Backroom dimension • Main water feed • Air Drops • Anticipate runs and material
required to complete install
• Bay area dimension • Main Electrical feed • Wall Penetrations (i.e. salt for softener,
• E-Stops hydraulic hose assemblies)
Chapter and/or
Item Installation Task Chapter Name
Page Number(s)
1 DETERMINE EQUIPMENT LOCATIONS
1.a Mount MCC and SCC Controller
1.b Mount Chemical Pumps
1.c Position RO Unit and Tank
1.d Mount Dryer Panel
1.e Mount HMI (Human Machine Interface): E-1063 or E-1063
1.f Air compressor
OPTIONAL ITEMS
1.g Position Pumping Station
1.h Reclaim modifications to Pumping station (if applicable)
2 MEET WITH ELECTRICIAN
2.a Coordinate E-Stop Locations
2.b Electricians install conduits and wires
3 ERECT FRESSSTYLER® FRAMEWORK
4 RAISE CARRIAGE ONTO RAILS
5 ERECT DRYER FRAME
6 INSTALL BOOM MOUNT TO WALL
7 INSTALL BOOM
8 OPTIONAL ITEMS
9 MEET WITH PLUMBER
9.a Plan System Component drain system
Including Air-Dump on compressor
9.b Plumber installs hard plumbing
10 PLACE FLOOR ITEMS IN PROPER BAY LOCATION
10.a Install Entrance Photo Eye
10.b Install Point of Entry System / POS in store
10.c Install Wait-Go / Navigational Signs
10.d Install Rocker Blaster / Undercarriage Wash
10.e Install Treadle and Bug Spray Option (if applicable)