Page 11 - Free Standing CTA™
P. 11

FREE STANDING CTA

                       Introduction


                       Visual Overview

                        Note:  The Primary Applicator is to be mounted on the equipment room side.


                          Drive-Through (In-Bay) System











                          Standard Tunnel System

















                          Tire-Tracking Tunnel System




































                        1MANUL089          Belanger, Inc. * PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681      7
   6   7   8   9   10   11   12   13   14   15   16