Page 12 - Free Standing CTA™
P. 12

FREE STANDING CTA

             Introduction


             Before You Get Started


                    Tools needed for installation:

                        miscellaneous hand tools                      safety glasses

                        work gloves                                   hammer drill with 1/2” bit

                    Supplies Needed for Installation:

                        1/2” poly-flow tube                           1/4” poly-flow tube
                        1/2” and 3/8” anchors or lag bolts
                        (depending on wall structure)


                    Equipment Included with Standard Tunnel System:                     Qty

                        MixStir™ with Timer Panel                                     1
                        CTA Primary Manifold Assembly                                 1
                        CTA Secondary Manifold Assembly                               1
                        Bell-Hose Assembly with Switch                                1


                    Equipment Included with Drive-Through System:               Qty
                        MixStir™ with Timer Panel                                     1

                        CTA Primary Manifold Assembly                                 1
                        CTA Secondary Manifold Assembly                               1
                        Bell-Hose Assembly with Switch                                1
                        Crossover Tube Assembly                                       1


                    Equipment Included with Tire Tracking System:                     Qty

                        MixStir™ with Air Pump and Foaming Panel                      1
                        CTA Primary Manifold Assembly                                 1
                        CTA Secondary Manifold Assembly                               1

                    Note:  Uncrate and inspect shipment for damage, and to verify that all pieces are there. If there is
                           any damaged equipment, file a claim with the trucking company immediately. Receiving
                           party is responsible for filing claim with trucking company. Notify your local distributor or
                           Belanger, Inc. immediately If shipment is determined damaged or incomplete.











              8       Belanger, Inc. * PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681          1MANUL089
   7   8   9   10   11   12   13   14   15   16   17