Page 16 - Free Standing CTA™
P. 16
FREE STANDING CTA
Installation
Bell-Hose Installation for Standard Tunnel and Drive-Through Systems
Bell-Hose and Wear Strip
Locate the components for the Bell-Hose and plastic Wear Strip assembly as shown below.
Rubber Bell Hose
108264 (2): 1CLAMP373
Floor Mounts (2)
Plastic Wear Strip
108264 1CLAMP373
The plastic Wear Strip will slow down the wear of the hose against the cement floor as
vehicles roll over it.
1) Lag the Wear Strip and Floor Mounts to the floor at the locations shown above.
2) Once lagged to the floor, secure the Bell-Hose to the two Floor Mounts realizing it will
need to be stretched and cut-to-fit. Secure it into place using the supplied clamps.
The completed assembly should appear as shown below.
Note: Connect one end of the hose to one of the mounts then stretch the hose and cut to
length. Secure that end in place with a clamp. Now stretch the hose to the other mount
and clamp into place.
A field supplied 1/4” poly-flow tube is to be run from the one mount to the pressure
switch.
12 Belanger, Inc. * PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL089