Page 36 - Airblade® Dryer - Mix and Match
P. 36

AIRBLADE® DRYER Mix and Match



             Installation


             4-Nozzle “Select” Frame Assembly: Floor Mounted

                Corner Clamps

                    1)  Locate the following parts:

                                       Item              Qty     Corner Clamp Pieces (2)
                           Dryer Leg Weldment             2

                           Corner Clamp Assembly          2

                           Black Plastic Caps             4
                           Lag Bolt 3 Zinc 5/8 x 6        8













                    2)  Locate the skid that the head beam assembly  shipped on. Clamp the head beam
                       assembly to the forks of the forklift and position it in its tunnel location.
                    3)  Lift it until there is a 91” clearance from the bottom surface of the head beam to the floor.


                    4)  Slide one of the clamp assemblies and one of the legs into place as shown below but do
                       not tighten the bolts until the height is set and the frame has been leveled. Be sure
                       the base of the legs face the entrance of the tunnel.

















                                                   Before                                  After

                    5)  Secure the clamp and leg into place on the other side. Do not tighten the bolts until
                       the height is set and the frame has been leveled.







              32                              Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681                                          1MANUL011
   31   32   33   34   35   36   37   38   39   40   41