Page 57 - Saber® Installation & Startup
P. 57

INSTALLATION & STARTUP

                      Chapter 5 Electrical



                      Onboard Dryer Panel




                                DO NOT punch ANY holes in the top of the enclosure. It may allow moisture to leak inside.
                                                         Doing so voids all warranties.

                          NOTE TO ELECTRICIANS AND ARCHITECHS
                            Conduit schedule indicates separation of 3 Phase and all other wires MUST be strictly
                            observed.  Please  read  wiring  notes  within  this  chapter.  Notes  are  also  reference  on
                            sheet 11 of the Electrical Prints.










































                                             The above image shows the components located inside of the Machine Control Center Enclosure

                              REFER TO YOUR SUPPLIED ELECTRICAL PRINTS, AND SITE
                                   SPECIFIC DRAWINGS FOR INSTALLATION DETAILS













                        1MANUL290       Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681   5-7
   52   53   54   55   56   57   58   59   60   61   62