Page 55 - Saber® Installation & Startup
P. 55
INSTALLATION & STARTUP
Chapter 5 Electrical
Machine Control Center (MCC) Panel
DO NOT punch ANY holes in the top of the enclosure. It may allow moisture to leak inside.
Doing so voids all warranties.
NOTE TO ELECTRICIANS AND ARCHITECHS
Conduit schedule indicates separation of 3 Phase and all other wires MUST be strictly
observed. Please read wiring notes within this chapter. Notes are also reference on
sheet 11 of the Electrical Prints.
The above image shows the components located inside of the Machine Control Center Enclosure
REFER TO YOUR SUPPLIED ELECTRICAL PRINTS, AND SITE
SPECIFIC DRAWINGS FOR INSTALLATION DETAILS
1MANUL290 Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 5-5