QUAD WAVE MITTER Signature ® Series


                       Installation

                       Tunnel Placement

                       When  placing  a  piece  of  equipment,  tunnel  depth  will  vary  from  site  to  site.  Be  sure  to  allow  an
                                                                        ®
                       adequate  operating  envelope.  The  Quad  Wave  Mitter   can  be  installed  facing  either  direction  as
                       there is no entrance or exit side.
                          1)  Position the assembled unit in it’s permanent tunnel location.
                          2)  While placing a level on the vertical surface of one of the legs, place shims under the base
                              plate as needed to make the assembly level in both directions. Repeat this leveling process
                              on the other leg.
                              Note:  Shims not supplied by Belanger, Inc.

                          3)  Once the assembly is positioned correctly and level, lag it to the floor using the supplied lag
                              bolts.










                                                              DIRECTION
                                                                  of
                                                               TRAVEL


























                                  45”                            Center
                                                                 Line


                             The 45” dimension is taken from the inside edge of the inside conveyor guide rail to the outside edge of the equipment leg.