Page 15 - Jet Pumping Station
P. 15

JET PUMPING STATION


                    Startup


                    Initial

                           Note:  The following steps are CRITICAL TO PROPER OPERATION!!

                           1)  Thoroughly wipe down all interior surfaces  of  the tank. Make sure  that no installation debris is left
                               behind.
                           2)  Open shut-off valve to inlet plumbing. Operate float valve manually by moving the float to the extreme
                               up, and the extreme down positions (fully off to fully on) several times prior to allowing water to reach
                               maximum level. The float valve will be slow to react the first time it is shut off. This is normal.
                           3)  Close shut-off valve and drain tank to purge any  debris  which may have accumulated in the inlet
                               plumbing during installation.
                           4)  Open shut-off valve and allow tank to refill.
                           5)  Make sure that the oil level in the pump is 1” from the top of the fill port (to the line on the oil fill plug’s
                               dipstick).
                           6)  Make sure that the un-loader is set to start under minimum pressure (fully open).
                           7)  Slowly increase pressure by  tightening  adjustment nut until a setting of 1000 PSI (68.9 BAR) is
                               achieved.



                                                                                                     Adjustment nut



                                                                                          Locking nut



















                           8)  Tighten locking nut.
                           9)  Listen for any erratic noise and look for unsteady flow.
                           10)  If the station has an airlock and the pump fails to prime:
                                  a)   Turn power off.
                                  b)   Remove drain plug (See Wanner manual) on the bottom center of the manifold.
                                  c)   Briefly restart the Jet Pumping Station™ and let it run until fluid comes out of the drain plug hole.
                                  d)   Turn power off and replace the drain plug.
                                  e)   Adjust un-loader to the desired operating pressure. (1000 PSI maximum)











                      1MANUL361          Belanger , Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681         13