Page 13 - Jet Pumping Station
P. 13
JET PUMPING STATION
Installation
Assembly
4) Level the machine by adjusting the built in leveling feet. This has direct bearing on float valve
performance.
Step 2:
tighten these nuts
Step 1:
raise or lower this nut
Horizontal leg
Leveling foot (near the floor)
(typical)
5) Install the inlet plumbing to float valve. A shut off valve should be installed in this feed line (supplied by
customer). In addition, a connection to the float valve inlet (3/4” FNPT) should be made with flexible
hose.
Main water feed 3/4” flexible hose required
(typically 2”) (supplied by customer)
Recommended 1”, minimum 3/4” copper
(copper, supplied by customer)
Float valve
Recommended 3/4” barbed
hose fittings
Reducer (supplied by customer)
(supplied by customer)
Float valve inlet assembly
Shut off valve 3/4” FNPT Outlet
(supplied by customer) plumbing to
tank
Note: Fluid inlet, minimum 3/4” feed to float valve.
1MANUL361 Belanger , Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 11