Page 9 - Jet Pumping Station
P. 9
JET PUMPING STATION
Introduction
Before You Get Started
Tools needed for installation:
hammer drill with 1/2” (13 mm) bit 25 foot (8 meters) extension cord
tape measure (25 foot [8 meters] or greater) tin snips
level safety glasses
miscellaneous hand tools work gloves
Equipment included: Qty
Jet Pumping Station™ (free standing) 1
®
Belanger, Inc. 1995
This manual and the accompanying equipment are protected by United States and International copyright and patent laws. You
may make one copy of this manual. Do not make additional copies of this manual or electronically transmit it in any form
whatsoever, in whole or in part, without the prior written permission of Belanger, Inc.
®
1MANUL361 Belanger , Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 7