Page 9 - Jet Pumping Station
P. 9

JET PUMPING STATION


                    Introduction


                    Before You Get Started


                           Tools needed for installation:

                               hammer drill with 1/2” (13 mm) bit     25 foot (8 meters) extension cord
                               tape measure (25 foot [8 meters] or greater)   tin snips
                               level                                  safety glasses

                               miscellaneous hand tools               work gloves

                           Equipment included:                         Qty

                               Jet Pumping Station™ (free standing)   1
























                              ®
                    Belanger, Inc.  1995
                    This manual and the accompanying equipment are protected by United States and International copyright and patent laws. You
                    may make one copy of this manual. Do not  make additional copies of this manual  or  electronically transmit it in any form
                    whatsoever, in whole or in part, without the prior written permission of Belanger, Inc.
                                                                               ®







                       1MANUL361          Belanger , Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681         7
   4   5   6   7   8   9   10   11   12   13   14