QUICKFIRE® Signature ® Series
Installation
Positioning the Stands (Legs)
Note: The stands will have to be leveled later during the installation, so do not pound any lag
bolts down all the way into the floor. Shims may also be required in the leveling process
although they are not supplied.
4) After making sure the stands are square to the conveyor, drill a 5/8” hole and place one 5/8”
lag bolt into place as shown below. Drill the other three holes.
Passenger Side Leg shown.
You can tell by the larger
plate surface being on the
side of the Boom and the Lag Bolts go in the outer (non-threaded) holes
angle bracket facing outward.
Leveling Bolts go in the inner (threaded) holes
Metal plate to
stabilize leveling
process (typical)
5) Locate the supplied 3/4-10 x 3-1/2” bolts and place them into the threaded holes of the two
Base-Plates. These will be later used as the “leveling Bolts”. Place a small piece of steel or
aluminum plate under each leveling bolt so that it does not penetrate the cement floor. Steel
or aluminum plating is field supplied.
6) Level stand both North, South, East and West
7) Now that the Stands are level, pound the lags all the way down.
8) Tighten the lag bolts.
Note: The stands will need to be leveled again after the Booms, Head Assemblies and Wash
Materials are installed.