Page 20 - Pivoting Wheel Stinger™ Mix and Match
P. 20

PIVOTING WHEEL STINGER Mix and Match


            Installation


            Utility Connections

            The overhead manifold assembly is determined and supplied in the field. This means that depending on the application
            desired, the installer has to determine the appropriate pumping platform and plumbing. You can use the “Water Chart” later
            in this document to help determine the needed utility components.
            The following notes are very important in order to insure a safe and proper installation.
               •   When hard-plumbing water feeds from the main water supply to the machine, be sure to use properly rated hose
                   to the down-feeds to the machine. This way when the machine vibrates, the hose allows flexibility whereas hard-
                   plumbing down to the machine may leak.
               •   Be sure to follow the criteria stated in the “Water Chart” shown on the next page. This will insure that when routing
                   fluids through elbows and over distances the pressure remains at the desired PSI.





























































             18        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681          1MANUL586
   15   16   17   18   19   20   21   22   23   24   25