Page 10 - UNIARCH
P. 10
UNIARCH
Introduction
Before You Get Started
Tools needed for installation:
hammer drill with 1/2” bit 25 foot extension cord
tape measure (25 foot or greater) tin snips
level safety glasses
miscellaneous hand tools work gloves
ladder 2 large pipe wrenches
Equipment included:
UNIARCH leg weldment (typical) 2
Accessory box with Coupling assemblies 1
Plastic UNIARCH Pendant (Black) 1
Foam covers (color depends on your order) 2
Accessory box contents (Brass Fittings):
Part Number Qty Description
1FSTNR-ST500 8 Kwick bolt 1/2” x 3-1/2”
1MCONC-BR025 12 1/4 MNPT x 1/4 FNPT x 1” long adapter, brass
1FTTNG-BH400 1 Barbed hose fitting stainless steel 3/4 MNPT x 3/4 barb hose
1MANUL795 1 UNIACH owners manual
1TEE-BR950 1 1-1/2 NPT tee, brass
1REDUC-BR960 1 1-1/2 x 3/4 reducer bushing, brass
1NIPPL-BR960 1 1-1/2 NPT closed nipple, brass
1UNION-BR150 1 1-1/2 NPT union, brass
1TIE750 4 Cable Straps
Accessory box contents (Stainless Steel Fittings):
Part Number Qty Description
1FSTNR-ST500 8 Kwick bolt 1/2” x 3-1/2”
1MCONC-SS025 12 1/4 MNPT x 1/4 FNPT x 1” long adapter, 304 stainless steel
2744 1 Barbed hose fitting stainless steel 3/4 MNPT x 3/4 barb hose
1MANUL795 1 UNIACH owners manual
1TEE-SS150 1 1-1/2 NPT tee, 304 stainless steel
1REDUC-SS300 1 1-1/2 x 3/4 reducer bushing, 304 stainless steel
1NIPPL-SS150 1 1-1/2 NPT closed nipple, 304 stainless steel
1UNION-SS850 1 1-1/2 NPT union, 304 stainless steel
1TIE750 4 Cable Straps
8 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (248) 380-9681 1MANUL795