Page 15 - UNIARCH
P. 15

UNIARCH



                       Installation


                       Arch Assembly
                              6)  Locate the supplied hose clamp and secure  the main water feed to the barbed hose fitting as
                                 shown below.














                              7)  Position and secure the assembled arch in  the tunnel using the information on  the  following
                                 page(s).























































                       1MANUL795             Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (248) 380-9681        13
   10   11   12   13   14   15   16   17   18   19   20