Page 15 - UNIARCH
P. 15
UNIARCH
Installation
Arch Assembly
6) Locate the supplied hose clamp and secure the main water feed to the barbed hose fitting as
shown below.
7) Position and secure the assembled arch in the tunnel using the information on the following
page(s).
1MANUL795 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (248) 380-9681 13