Page 26 - Foaming Pods
P. 26
FOAMING PODS
Installation
Preparing the UNIARCH
In order to mount the Foaming Pods to a UNIARCH, the protective foam must be cut. The
recommended location is shown below.
Front View
3”
3”
Closeup of foam cut for mounting
Helpful Hint
85” Dimensions and placement are
recommendations. Actual placement may
vary per location and cusomer preference.
Keep in mind that you will want to carefully
plan where you would like to mount the pods
BEFORE cutting the foam.
Floor
Top View
103”
This dimension varies with mounting location and rotation position of Pods
Helpful Hint
When mounting Pods to a UNIARCH, thay can be rotated on the Tube-Manifolds for
even more flexibilty in positioning (shown below).
Pods can be rotated around the UNIARCH Tubes. Pods can also
This can allow the foam to hit the vehicle sooner be pivoted up
and provide a better rinse. and down.
Helpful Hint
Direction of Travel
Be sure to turn the pods so that they are facing the entrance
of the tunnel. This allows maximum foam application before
making contact with the water/chemicals
Note: The above image is shown with Triple Foaming Pods. The mounting procedure is
the same for Single Pods.
24 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 1MANUL770