FOAMING PODS


                       Installation


                       Assembly

                          Mounting the Pods to the tubular frame of the UNIARCH.

                       Parts Identification

                                                     UNIARCH Mounting Kit Required













                              1)  Locate the Mounting Kit box included with purchase and remove all of the parts enclosed.
                              2)  Mounted on the side of the Pod Assembly is an aluminum pivot spacer. Place the spacer into the
                                 pivot hole in the clamp and screw the clamp and Pod Assembly together using the provided 3/8-16
                                 x 7/8” socket head fasteners, flat washers and lock washers.














                              3)  Repeat this process on the opposite side Pod Assembly.
                              4)  Mount the Pod Assembly to the desired component following the recommended dimensions and
                                 locations. Location on each piece of equipment may vary according to customer preference.
                                 Refer to the Component Charts earlier in this document.
                              5)  The center distribution block can be mounted on either the frame-work or the Belanger Utility
                                 Trak™ where applicable.
                              6)  Once Distribution Block has been secured into place, locate all of the supplied 1/4” air-line. Black
                                 air-line will be used for air feeds and the clear air-line will be used for water and chemical flow.
                              7)  Make sure all lengths of air-line are at equal lengths. This will provide a more balanced distribution
                                 of water and chemical.
                              8)  Secure the air feed lines to the straight check-valves located at the bottom of the Pods Feed-Block.
                              9)  Secure the water/chemical feed lines to the remaining straight check-valves located at the top of
                                 the Pods Feed-Block.















                       1MANUL770             Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681        23