Page 29 - Foaming Pods
P. 29

FOAMING PODS


                       Utility Connections


                       Connections for Foaming Pods

                       If you have purchased the Triple Foaming Pods, follow directions below for Distribution Manifold to
                       Pods connections.

                          Triple Foaming Pods: Using the image below, make the initial air-line connections. These are
                          the connections for the chemical/water feeds.
                         Helpful Hint                                                       Helpful Hint
                         Be sure to cut                                            Be sure to keep all air-lines from both
                         all air-lines to                                            pods in alignment (matched up).
                          the same
                           length to
                         ensure even                                     Supplied 1/4”
                          water and                                        air-line
                          chemical
                         distribution to
                          both sides.
                                                   Flow Control

                          Using the image below, make the initial air-line connections. These are the connections for the air
                          (pneumatic) feeds.
                         Helpful Hint                                                          Helpful Hint

                         Be sure to cut                                                    Be sure to keep all air-lines
                         all air-lines to                                                 from both pods in alignment
                          the same                                                             (matched up).
                           length to                                   Supplied 1/4”
                         ensure even                                     air-line
                          water and
                          chemical
                         distribution to
                          both sides.

                                                   Check-Valve


                          Single Foaming Pods: If you have have purchased the Single Pod system a Distribution
                          Manifold is not required or supplied.
                          Using the image below, make the initial air-line connections. These are the connections for the
                          chemical/water feeds from one pod to the other using the supplied 1/4” tees.
                                                                1/2” poly-flow line in air feed
                                                             1/2” poly-flow line in
                                                             water/chemical feed               Helpful Hint

                                                                                          Be sure to cut all air-lines to
                                                                 Supplied 1/4”             the same length to ensure
                                                                   air-line                even water and chemical
                                                                                           distribution to both sides.


                                             Supplied   Supplied
                                               Tee      Elbow