Page 29 - Foaming Pods
P. 29
FOAMING PODS
Utility Connections
Connections for Foaming Pods
If you have purchased the Triple Foaming Pods, follow directions below for Distribution Manifold to
Pods connections.
Triple Foaming Pods: Using the image below, make the initial air-line connections. These are
the connections for the chemical/water feeds.
Helpful Hint Helpful Hint
Be sure to cut Be sure to keep all air-lines from both
all air-lines to pods in alignment (matched up).
the same
length to
ensure even Supplied 1/4”
water and air-line
chemical
distribution to
both sides.
Flow Control
Using the image below, make the initial air-line connections. These are the connections for the air
(pneumatic) feeds.
Helpful Hint Helpful Hint
Be sure to cut Be sure to keep all air-lines
all air-lines to from both pods in alignment
the same (matched up).
length to Supplied 1/4”
ensure even air-line
water and
chemical
distribution to
both sides.
Check-Valve
Single Foaming Pods: If you have have purchased the Single Pod system a Distribution
Manifold is not required or supplied.
Using the image below, make the initial air-line connections. These are the connections for the
chemical/water feeds from one pod to the other using the supplied 1/4” tees.
1/2” poly-flow line in air feed
1/2” poly-flow line in
water/chemical feed Helpful Hint
Be sure to cut all air-lines to
Supplied 1/4” the same length to ensure
air-line even water and chemical
distribution to both sides.
Supplied Supplied
Tee Elbow