            Siding tear off. Remove the old siding, break debris into convenient size and pile on site. Using hand
            tools. Includes the cost of driving or pulling out nails to prepare the surface for installation of new siding.
            Add the cost of caulking and flashing, if needed. No salvage value assumed.
              Aluminum siding, horizontal                   BL@.027   SF         --      0.88       0.88
              Aluminum siding, vertical                     BL@.031   SF         --      1.01       1.01
              Asphalt siding, panel or roll                 BL@.021   SF         --      0.69       0.69
              Mineral siding                                BL@.027   SF         --      0.88       0.88
              Plywood siding                                BL@.017   SF         --      0.56       0.56
              Plywood siding with battens                   BL@.019   SF         --      0.62       0.62
              Stucco on metal lath                          BL@.035   SF         --      1.14       1.14
              Stucco on wood lath                           BL@.040   SF         --      1.31       1.31
              Vinyl siding, horizontal                      BL@.021   SF         --      0.69       0.69
              Vinyl siding, vertical                        BL@.024   SF         --      0.78       0.78
              Wood siding, horizontal                       BL@.030   SF         --      0.98       0.98
              Wood siding, vertical                         BL@.033   SF         --      1.08       1.08
              Wood shingles or shakes, single course        BL@.021   SF         --      0.69       0.69
              Wood shingles or shakes, double course        BL@.026   SF         --      0.85       0.85
              Add for work above 9' high                    BL@.008   SF         --      0.26       0.26
              Remove 1" wood furring, per linear foot       BL@.020   LF         --      0.65       0.65

            Soffit tear off. Remove board, panel, vinyl or aluminum soffit and trim and pile debris on site. Using
            hand tools and working from a ladder at 8' to 10' height. Includes the cost of driving or pulling out nails to
            prepare the surface for installation of a new soffit. No salvage value assumed. Per linear foot of soffit.
              To 12" wide soffit                            BL@.016   SF         --      0.52       0.52
              Over 12" wide soffit                          BL@.020   SF         --      0.65       0.65
              Add for heights over 10' to 20'               BL@.008   SF         --      0.26       0.26

            Remove and replace for siding work. Remove in salvage condition using hand tools. Then replace
            when siding work is complete.
              Awning or hood over door or window           BC@1.75    Ea         --    70.46      70.46
              Patio canopy, per square foot                BC@.088    SF         --      3.54       3.54
              Fixed shutters, per pair                     BC@1.00 Pair          --    40.26      40.26
              Operable shutters, per pair                  BC@1.50 Pair          --    60.39      60.39
              Storm windows, each                          BC@.625    Ea         --    25.16      25.16
              Storm doors, each                            BC@2.50    Ea         --   100.70     100.70
              Gutters or downspouts, per linear foot       BC@.080    LF         --      3.22       3.22