Page 68 - 2018 National Home Improvement
P. 68
2018 National Home Improvement Estimator, All Rights Reserved Page 51
Asphalt paving. Small jobs and repairs. Using hand tools, except as noted. Add the cost of equipment
rental (pneumatic hammer, compressor, front end loader, roller), hauling and dump fees, as required.
Break up and remove asphalt pavement up to 3" thick using a pneumatic hammer, loosen and load
bituminous debris on truck with shovel
Per square yard of pavement B8@.147 SY -- 5.77 5.77
Trim area, break up pavement with a pneumatic hammer, load debris on truck with a front end loader,
remove existing base to depth of 3"
Per square yard of pavement B8@.470 SY -- 18.46 18.46
Add for job setup B8@.053 SY -- 2.08 2.08
Spread hot mix 3" thick with shovel, rake smooth and hand tamp
Per square yard of pavement BL@.266 SY 23.94 8.68 32.61
Add for job setup BL@.026 SY -- 0.85 0.85
Shovel, rake and hand tamp 3" thick base material, sweep and tack coat, shovel, rake and hand tamp
3" bituminous pavement
Per square yard of pavement BL@.316 SY 29.80 10.31 40.11
Add for extra 1" of thickness BL@.024 SY 8.02 0.78 8.80
Add for job setup BL@.039 SY -- 1.27 1.27
Shovel, rake and machine roll 3" thick base material, sweep and tack coat area, shovel, rake and
machine roll 3" bituminous mix
Per square yard of pavement B8@.407 SY 29.80 15.98 45.78
Add for each 1" of thickness B8@.022 SY 8.02 0.86 8.88
Add for job setup B8@.104 SY -- 4.08 4.08