Page 177 - WU183.indd
P. 177

IAAF W ORLD U18 REPORT









                       •  Provide designated parking space for 25 vehicles being:   •  Foot bridge over the railway line from Nyayo Village
                         10 emergency vehicles; 10 parking spaces for IAAF   to the training fi elds
                         visitors and 5 parking spaces for the shuttle services.  •  Back-up generators in the Nyayo village
                       •  Provide emergency fi re rescue services; Provide fi re
                         safety points;                              Project Resource Allocation Plan
                       •  Provide a designated back up helicopter landing zone;
                                                                        e total project budget (TPB) was Kenya Shillings
                       Protocol and Hospitality                      Seven Hundred Million (Kshs. 700,000,000.)    e
                                                                     TPB catered for all project development costs, design
                       •  Provide LOC with offi  ces at the athletes’ village;  services, site preparation and construction costs.  It
                       •  Provide lounges for VIPs, delegates, athletes, team   was however exclusive of costs of the following works
                   KYEB
                                                                     which were carried out by external parties such as
                         managers, sponsors and IAAF family
                                                                     government agencies.
                       •  Provide dedicated information desk, customer service
                         at the village and at the training grounds Provide an
                                                                     1.  Repair and construction of roads within Kenyatta
                         accreditation space;
                                                                        University
                       •  Provide a secluded area for the fi nal banquet
                                                                     2.   Street lighting
                       •  Support infrastructure for additional water supply,
                                                                     3.   Sinking of water boreholes and construction of
                         street lighting, roads and footbridge.
                                                                        Elevated water tanks
                       •  Repair and construction of roads within Kenyatta
                                                                     4.   Water reticulation framework for Irrigation at
                         University
                                                                        the training grounds
                       •  Street lighting of roads within Kenyatta University
                                                                     5.   Foot bridge over the railway line from Nyayo
                       •  Sinking of water boreholes and Elevated water tanks
                                                                        Village to the training fi elds
                         within the Nyayo Village
                       •  Water reticulation framework for Irrigation at the
                         training grounds