Page 18 - LESSONS LEARNED BY MADARFM
P. 18

REAL TIME ISSUES (BURJ RAFAL TOWER)












                 Concern Area                                     Issue                                       Cause                                         Risk                                        Impact on Customer


               2.Smoke Detection B. Earth fault from Heat No heat shrink tube Device will not be active Customer Loyalty


               and        Fire       Alarm detector that is installed used for the connector incase of an emergency.                                                                     Customer Damage

               System                              inside the kitchen area.                     which in turn touches                                                                    Brand Damage

                                                                                                with        the        aluminum                                                          Reputation Damage

                                                                                                ceiling installed inside                                                                 Severe Injuries

                                                                                                the            kitchen           area

                                                                                                causing earth fault.














                                Ensure             any         modification                 to

                                existing international decorations


                                are approved by owner, and

                                smoke detector and fire alarm

                                system              are          insulated               and


                                verified after work completed.

                                Note: This must be completed

                                by       approved               specialist             sub-


                                contractor






                                                                                                                                                                                                                                                         18
   13   14   15   16   17   18   19   20   21   22   23