Page 20 - LESSONS LEARNED BY MADARFM
P. 20
REAL TIME ISSUES (BURJ RAFAL TOWER)
Concern Area Issue Cause Risk Impact on Customer
3. Utility Meter A. Meter measures Lack of testing and Incorrect utility billing Customer Loyalty
electricity for different commissioning during for the owner. Customer Damage
apartment. project phase. Brand Damage
Reputation Damage
B. Meter installation and Meter showing offline Concern from SEC (Saudi
network cable from the system. Electricity Company) in
connection is not as per Concentrator not relation to meter change
standard. responding to the and switching of meter
commands from reading / billing.
workstation.
Operator to be in attendance
to ‘view’ the testing and
commissioning of the
metering system.
Training to be provided by the
specialist sub–contractor.
20