Page 1290 - Foton Workshop Manual - Aumark (BJ1099)
P. 1290

41-10         HEATING AND AIR CONDITIONING - INSTRUMENT PANEL AIR PASSAGE


                                                      (c).    Install and tighten the fastening bolts at
                                                              the left of the A/C vent pipe assembly.
























           6.     Install the instrument panel (Refer to "Chapter 52 Instrument Panel & Auxiliary
                  Instrument Panel - Instrument Panel, Replacement")



























































                                                                                                     Page 1290
   1285   1286   1287   1288   1289   1290   1291   1292   1293   1294   1295