Page 47 - AP2464B E-BOOK (KKR2 TOWER)
P. 47

MAINTENANCE AND SERVICES WORK





                                                            Routine Elevator Maintenance Checklist

                                                            To maintain proper elevator operation, check and
      Both maintenance and services                         correct:
         work managed under KCJ                             • Response time

            Engineering Sdn Bhd.                            • Travel time between floors
                                                            • Leveling
                                                            • Door operation
                                                            • Starting and stopping
                                                            • Hall and call lights and floor indicators


                                                            To maintain elevator support systems, check and
      It is important to ensure correct elevator            repair:
                    maintenance                             • Emergency lighting and alarms
                                                            • Communications devices (for example, intercoms
                                                              or telephones)

                                                            To maintain the physical condition of an elevator:
      Accomplished only by qualified, trained               • Maintain cleanliness
      technicians using the correct equipment               • Check for and repair interior damage
                      and tools                             • Check signage and repair when necessary






     One function of maintenance is ensuring                Operations that are commonly timed and checked
         continued operation by preventing                  include the following:
          excessive wear and breakdown.                     Floor-to-floor time: Time required to make a one-
                                                            floor run. Measured from the time the hoistway
                                                            doors start to close at one floor until they are fully
                                                            open at the next floor.
                                                            Performance time: Measured from the time the
     A more important aspect of maintenance                 doors start to close at one floor until they are
     is to ensure that the equipment continues              sufficiently open to allow passenger exchange at
      to perform as it was originally designed
                                                            the next floor.
                                                            Car start time: Measured from the time the doors
                                                            start to close until the elevator actually moves.
                                                            Brake-to-brake time: Measured from the time the
                                                            car starts until it stops on a one-floor run.
                                                            Door open time: Measured from the time doors
                                                            start to open until fully open.
                                                            Door dwell time: Length of time doors remain fully
                                                            open by car or hall call without being affected by
                                                            cancellation features.


                                                            DO PROPER MAINTENANCE

                                                                         REGULARLY!!!
   42   43   44   45   46   47   48   49   50   51   52