Page 48 - AP2464B E-BOOK (KKR2 TOWER)
P. 48

RECCOMENDATION














                   The companies(KCJ
                  Engineering Sdn Bhd)                                   It also important to

               should be able to analyze                            perform a traffic study to

                 the building’s traffic and                              collect key data on
                     elevator service to                                elevator usage and

                ascertain the capabilities                            performance during a
                  of the present elevator                               preselected period.

                           equipment.















                                                                     It indicating whether the

                                                                    system is operating up to
                A traffic study provides a                          its original specifications
                     detailed traffic and

                 performance analysis of                                 and sign of proper
                                                                          maintenance or if
                          the elevator
                                                                    performance levels have
                                                                                 slipped.
   43   44   45   46   47   48   49   50   51   52   53