Page 4 - SAMPLE Proposal 2
P. 4
General Notes
➢ Executed build contract, deposit, and building permit required before work begins.
➢ TKG to begin project after conducting an official kickoff meeting with clients.
➢ Estimated Job Length approximately 26-28 weeks from the start of construction.
o Subject to weather, material delays, special order and custom fabrication delays, govern-
ment processes, etc.
➢ Any/all references to “architectural plans” are referring to the plans emailed on 7/19/19 by 906
Studio Architects.
➢ Any/all references to “structural plans” are referring to the plans emailed on 7/18/19 by CSA
Structures.
➢ BuilderTrend is the official project management software platform of TKG. Homeowners are
invited to engage the project online through this system.
Project Preparation
PLANNING
➢ Local building permit fees are included.
➢ This scope of work does not include any costs associated with additional engineering, surveying
or any other service fees required by other outside entities (e.g. local municipality, utility com-
panies, etc.)
➢ Pursuant to the homeowner’s request, this scope of work excludes ALL engineering fees and
ALL costs associated with the ramifications of an engineer’s recommendations related to the
attic space / future bonus room area. More details in the section named, Framing.
MOBILIZATION
➢ Construction waste services are included in this scope of work.
➢ As a courtesy to all workers, a portable toilet will be placed on site. This service is included in
this scope of work.
➢ TKG shall utilize all existing driveway surfaces as parking area and/or material storage area.
➢ Grass areas impacted by construction will be seeded and covered with straw at the end of the
project.
JOB SITE
➢ All utilities at 215 Franklin Road will remain in the homeowner’s name throughout the project.
➢ This scope of work includes removing small plant life necessary for construction to be per-
formed.
➢ No tree removal or necessary trimming anywhere on the property is included.
➢ No site grading or general excavation is included.
SURFACE PROTECTION
➢ TKG shall provide necessary protection for surfaces or areas that shall remain in the home.

