Page 7 - Railways
P. 7

www.moniterra.engineering                                                                  RAILWAYS


      PROJECT: “RENOVATION OF INFRASTRUCTURE – FOUNDATIONS

      AND SUPPORT OF TUNNEL FROM OMONOIA TO MONASTIRAKI OF
      THE ATHENS PIRAEUS ELECTRIC RAILWAYS S.A.”





       1. A FEW WORDS ABOUT THE PROJECT:                    network were made with a high precision 3cc geodetic station
                                                            for angles and +/- 1mm+2ppm for distances. The polygonal
       The Athens Piraeus Electric Railways is one of the oldest Greek   routings that followed were fully tied to the two ends of the
       enterprises in operation (140 years) and its history is interlinked   main horizontal network. The distances between the peaks
       with the history of Greece over this period.
                                                            were approximately 150 m. and less where deemed necessary.
       The first railway was inaugurated in 1869, and, up to 1904, the   Elevation  Network: The primary and secondary elevation
       Athens-Piraeus line was served by steam engines. After that,   network was  measured using geometric levelling  with the
       the trains were powered by electricity and the electric railways   required precision. The new elevation network was also
       were modernized. In the context of this modernization and the   correlated with the existing level benchmarks of the sections
       upgrade of the ISAP railways, a renovation of the infrastructure-  on  both  sides  at  the  ends  of  the  Piraeus  to  Kifissia  project
       foundations, and the support of the Omonoia-Monastiraki   (K.P. 0+050 – K.P. 25+600). With regard to the primary level
       tunnel started in 2008.
                                                            network, fixed points were established throughout the length
                                                            of the entire Piraeus-Kifissia line outside the fencing, so that
       2. OUR CONTRIBUTION TO THE PROJECT:                  they were located outside the project’s zone of influence. The
                                                            distance between the established points was approximately
       The implementation of this project required constant surveying  400 meters. The Level Network was measured with digital
       support, both before and after the start of construction. Our  levels +/- 1 mm/Km.
       contribution pertained to both these stages with corresponding   Surveying
       surveying works each time, for kilometre points from 0+650
       (Neo Faliro Station) to 26+600 (Kifissia Station), as follows:  The complete surveying of the existing condition of the railway
                                                            network  (lines,  surrounding  space,  stations,  work  lines,
       - DESIGN STUDY PHASE
                                                            continuous welded rails, technical works, the positions of the
         •   Establishment and resolution of primary and secondary  cable troughs, manholes, existing utilities networks – operating
            horizontal and elevation control network.       systems of ISAP S.A. overhead, electric joints etc.) was
                                                            conducted using two methods:
         •   Horizontal and elevation surveying of the existing lines
            and the surrounding space, inside and outside the  •   Imaging with geodetic station Trimble S6 High Precision 1’’
            tunnel, stations, and work lines.                   (1mm+1ppm).
         •   Imaging of all survey data in drawings and digital format   The general imaging of the railway network (except for the
            (horizontal plans, longitudinal sections, cross-sections).  tunnel), the stations, surrounding space, etc., was mainly
                                                                based there.
                                                                The already established fixed points of the trigonometrical
       In more detail,
                                                                network were used for tying.
       Establishment and resolution of primary and secondary   •   Surveying with the GRP 1000 railway track geometry
       horizontal and elevation control network                 control system, on which the detailed imaging of the tracks
       The points of the two networks were tied to the State    was based, and the GRP 5000 control system, which
       Trigonometrical Network.                                 consists of the GRP 1000, including a digital Amberg
                                                                Laser Scanner 5003. The latter was used especially for
       Horizontal Network: For the primary horizontal network, two   high precision surveying of points of the perimeter of the
       fixed points were established on the exterior of each station,
       so that they would not be affected by the construction works.   tunnel and its clearance, as well as the drawing of the
                                                                cross sections.
       They were positioned at the start and end of each station
       and they were mutually visible. There was also densification  The use of the GRP 1000-5000 became even more necessary
       of  fixed  points  between  stations  where  deemed  necessary.  during the project’s construction phase, as will be seen below.
       The measurements of the primary trigonometrical network of   This system, operated by appropriately trained staff, is the ideal
       the two peaks of each station were made with GPS and the   instrument for survey works on railway projects, and especially
       coordinates were entered into the Greek Geodetic Reference   for projects that include such a long length of railway tracks,
       System (EGSA) 87.
                                                            where the need to save time due to the strict deadlines and
       - The secondary horizontal network was installed and marked  for a quality result are very high. This system was used for this
       permanently close to the working site. It consisted of points  specific project, supported by geodetic Stations LEICA 1201,
       of paired mutual visibility, and was connected with the basic  1’’,+/- (2mm+2ppm) , LEICA 2003, 0,5’’, +/- (1mm+1ppm) ,
       trigonometrical network of the Hellenic Military Geographical  and the Amberg Laser Scanner. The advantages of the GRP
       Service. The measurements for the secondary horizontal  1000-5000 system are: