Page 13 - Resumes.indd
P. 13
Timothy Senecal
Superintendent
EDUCATION REFERENCES
Wentworth Institute of Technology, Barry Heidke, Project Manager
AS Building Construction DCAMM
(Bridgewater State University)
LICENSES 617-727-4003
Boston Builder’s license no. B19321,
Class 2
Warren Fairbanks
Massachusetts Construction Supervisors Associate VP, Facilities and Capital
license no. CS06791 Planning
Framingham State University
SPECIAL TRAINING 508.626.4590
OSHA 10- and 30-Hour Training
YEARS OF EXPERIENCE
29
YEARS WITH BARR & BARR
11
Tim thrives on a personal, hands-on approach. He will walk your site every day and be in constant communication with the
subcontractors to promote site effi ciency. Tim will provide daily oversight of project safety, site utilization and quality and
he will ensure that the fi eld trades are coordinated and work diligently and safely on even the most challenging project site.
SIMILAR PROJECTS
New Science Center on Occupied Campus New Surgery Center
Amherst College, Amherst, MA Cooley Dickinson Hospital, Northampton, MA
258,000 SF. Th is four story cast in place concrete Science Building 116,000 SF. Th e four-story Surgery Center features 32 patient
is organized into fi ve wings that resolve the massing into individual rooms, 6 private rooms, 6 operating rooms, a post-anesthetic care
elements that respect the scale and reinforce the character of the unit (PACU), a central sterile processing (CSP) department, an
overall campus. Th e “science commons” is a multi-story space expanded joint replacement center and multiple connections to the
that unites the fi ve wings. Th e project scope includes upgrades existing building. Th e project also required generator replacements,
to the campus infrastructure that will support the new Science laboratory renovations, MRI and utility infrastructure.
Center and new Greenway dorms, including steam, chilled water,
stormwater, sanitary sewer, electric and tele-data. New Residence Hall on Occupied Campus
Mount Holyoke College, South Hadley, MA
Occupied Academic Building Renovation & Addition 75,000 SF. Creighton Hall, the school’s fi rst new residence hall in
Bridgewater State University (DCAMM), Bridgewater, MA over 40 years, is certifi ed LEED Gold. Home to 176 students, the
211,300 SF, LEED Silver. Partial demolition and renovation of building comprises two main wings of rooms and suites connected
the Marshall Conant Science Building, plus a major addition. by a large shared space featuring a kitchen, game room, computer
Th e project provided more than 85 labs, 18 general purpose lab, television room, and formal living room with fi replace.
classrooms, an observatory, a rooftop botanical garden and
greenhouse, offi ces, and support space for the biology, Chemical Central Research & Materials Testing Laboratory
Sciences, Earth Sciences, Geography, Math, Computer Science MassDOT (DCAMM), Westboro/Hopkinton, MA
and Physics Departments. 47,180 SF. Th e new partial one and two story, 47,180SF Central
Research and Materials Testing Laboratory will house 76 employees.
Academic Building Renovation & Expansion Th e primary function of this facility will be to perform sampling
Framingham State University (DCAMM), Framingham, MA and testing of materials used on highway and bridge projects. Th is
188,000 SF, LEED Silver. Th e academic facility upgrade includes a building will encompass material testing labs, material storage, moist
four-story addition that houses 16 teaching laboratories, including cure room, a records storage room, training and conference rooms,
related prep and supply spaces, plus faculty research spaces, joined to and various mechanical rooms.
the existing facility by a four-story atrium space. Selective interior
renovations in the existing Hemenway Hall and the Annex provide Academic Campus Center
a fully accessible, substantially improved teaching environment. Tufts University, Boston, MA
104,000 SF. Major interior and exterior renovations to the Sackler
Occupied Academic Building Renovation Campus Center. Th e project enclosed an exterior balcony, gutted
Tufts University, Boston, MA and renovated an entire fl oor for administrative space, established
125,000 SF. Th e Sackler Campus Center renovation involved major corridors on three fl oors, expanded the café, demolished a lecture
interior and exterior renovations on each of the eight fl oors of the hall to create a gathering place, and created a fi tness center.
Sackler Campus Center Building. Signifi cant areas of project scope
included the expansion of the café, several lounges, demolition of New Cancer Center
an existing lecture hall in the basement into a social gathering area,
creation of a modern fi tness center in the basement and enclosure Baystate Medical Center, Springfi eld, MA
of an exterior balcony on the 8th fl oor. Center for Cancer Care including 4 linear accelerator
rooms and HDR rooms.